TOLL FREE + 1 786 600 1468
info@scubagalapagos.com

Baltra´s Track on maintenance by three months

 

Since, Monday August 26th 2013 and during the next three months, the track of Baltra Airport (Galapagos) shall be subjected to maintenance.

This was announced by the Dirección General de Aviación Civil (DGCA) which authorized ECOGAL, concessionaire of the airport, to perform such work. According to the FAA, the goal is to improve the operating conditions in the central belt of the track. This maintenance consists of placing a binder on the existing asphalt concrete surface layer. The above works will not affect flight operations from mainland Ecuador. For this work the airport will be closed 14:00 to 9:00 the next day. Different airlines operating at the airport have been duly notified island of jobs.

This content was originally published by Journal TRADE at the following address:

http://www.elcomercio.com/pais/Galapagos-aeropuerto_de_Baltra-obras-mantenimiento-operaciones_aereas_0_977902426.html

More News

#cometogalapagos #naturalistcruises

 

 


Copyright © 2013

Email: info@scubagalapagos.com
Quito - Ecuador
Powered by: Posicionarte